Skip to content
Hail or wind damage? Book a free roof inspection (404) 737-0942
Roofing Brookhaven logo
Rows of muted purple-gray asphalt shingles across a roof

Dimensional asphalt shingles

Architectural Shingle Roofing in Brookhaven

The most common roof on the street, installed the way it is supposed to be. Every nail where it belongs.

Good Shingles, Installed Right

Architectural shingles are the standard for good reason. They are thicker than old flat 3-tab shingles, they have a layered look that hides small wavy spots in the deck, and they hold up better to wind. But a shingle is only as good as the way it goes on. Most shingle failures we see are installation problems: nails placed too high or too low, too few nails per shingle, no starter strip at the eaves, skipped ice and water barrier in the valleys, old flashing reused. A roof like that can look fine for a few years and then start losing shingles in every big storm. We install to the manufacturer's written instructions. That means the right number of nails in the nailing strip, a proper starter course at the eaves and rakes, underlayment over the full deck, barrier in valleys and at penetrations, new drip edge, new flashing and ridge cap made for the job. We also check the attic ventilation, because a roof that cooks from underneath wears out early. You pick the color. We handle everything under it.

What Goes Into a Shingle Roof

You will see the shingles. What keeps them on sits underneath.

  • Starter course

    Factory starter along eaves and rakes, giving the first course something to bond to.

  • Correct nailing

    The right count and placement in the nailing strip on every shingle.

  • Full underlayment

    Synthetic underlayment across the deck as a second line against water.

  • Valley protection

    Self-adhering membrane lining every valley and ringing each pipe and vent.

  • New flashing

    Step flashing and drip edge replaced, never bent back into place.

  • Ridge cap

    Purpose-made cap shingles along ridges and hips for a clean finish.

How a Shingle Job Runs

  1. Measure and quote

    We inspect, measure and give you an itemized quote.

  2. Choose your color

    Pick a shingle line and color. We confirm the date.

  3. Install

    Tear-off, deck repairs, underlayment, flashing and shingles in the right order.

  4. Clean and walk

    Debris out, magnet sweep, and a final look together.

Why Our Shingle Roofs Stay Put

  • Nails in the strip

    The single biggest reason shingles blow off is nailing. We get it right.

  • No reused metal

    Old flashing comes off with the old roof.

  • Airflow checked

    Balanced vents help shingles last.

  • Starter strip installed
  • Correct nail count
  • New flashing
  • Vents balanced

Ready for a New Shingle Roof?

We will measure, show you options and give you a number in writing. No pressure, no hurry.